jgj106-2014 建筑基桩检测技术规范.doc
106-2014 Building Pile Testing Technical n
106-2014 Building Pile Testing Technical n may be unfamiliar to many n nals。What does it mainly regulate and what are its basic contents。The following is a n of basic n on 106-2014 Building Pile Testing Technical n for n nals:
To ensure the quality of pile testing work。standardize the pile testing method。provide a reliable basis for design and n acceptance。and meet the requirements of safety。advanced technology。accurate data。and correct n。this n is formulated.
The main technical contents of this n are: 1.General ns。2.Terms and symbols。3.Basic ns。4.Single pile vertical compressive static load test。5.Single pile vertical tensile static load test。6.Single pile horizontal static load test。7.Core drilling method。8.Low strain method。9.High strain method。10.Sonic n method.
unfamiliarThis n was approved and released by the Ministry of Housing and Urban-Rural Developme
nt in 2014 with the announcement number 384.and came into effect on October 1.2014.The original Building Pile Testing Technical n 106-2003 was simultaneously abolished.
Basic n:
Title: Building Pile Testing Technical n
Number: 106-2003
Approval Department: Ministry of n of the People's Republic of China
n Date: July 1.2003
Editorial Department: China Academy of Building Research
版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系QQ:729038198,我们将在24小时内删除。
发表评论