模具常用英语!
2008年09月12日 星期五 15:56
模具英语句子
1. XXX!你现在有空吗,我可以问你一些问题吗?
Could I ask you some questions if you are free? / Are you fr 2. 请问此产品的面是否为外观面?表面做什么处理?是晒纹/抛光?Can you tell me whether the surface of this part is a visibl surface? Texture or Polishing ?
3. 请问产品这个面可否加顶针或顶块?产品允许加扁顶针吗? Does this part need an ejector pin or an ejector bar? Can we 4. 这个产品的柱位我们打算做司筒。(或镶针)可以吗?
Can we add ejector sleeves or ejector pins in the boss of th 5. 产品的这个位置不能出模,我们打算做行位,在此面上会有分模线There's an undercut at this position and it needs a slider. this side, is that OK?
6. 产品里面的这个位置我们打算做斜顶或内行位,有问题吗?
We will make the lifter and (inner) slider in this position, 7. 你提供的2D产品图与3D产品图不一致,请问以哪一个图面为准? The 2D and 3D drawing you provided is not the same, can you 8. 你提供的3D产品图有的地方没有出模角,有的地方胶位太厚,有的There is no draft angle in the 3D drawing, some materials ar thin. Can we modify this part by ourselves? We will sen
9. 按你们提供的缩水率千分之五,这个模具的尺寸已经做到了According to the shrinkage one over two hundred, the mold ha 10. 产品的这个位置太小,导致模具钢料太溥,能够加宽这个位置吗This position is too small and will make the steel material 11. 斜顶与后面的柱位空间太小,斜顶在运动时会干涉到柱子,能移The angular lifter interferes with the boss during ejection. 12. 这个筋骨位胶厚太溥,而且高度偏高,注塑时很难填充这个筋位The rib here is too thin and on the high side, so it will be injection, can you increase the thickness of this rib?
13. 你是想将此筋骨位的高度加高/减低吗?加胶的位置我们将用铜公Will you increase/decrease the material on this rib? We will
14. 这个样板的筋骨位底部烧焦,是因为排气不良,我们可以在
This sample has been burned in the bottom because the ventin 15. 重做镶件大约需要5-6天时间,你能接受吗?
It will take about 5 or 6 days to redo the insert, is that O 16. 产品的这个面我们已经做了晒纹处理,如果需要加胶,这个面我We have made the texture on this side, if we add material, i texture by out-resourcing, so we suggest using the texture b 17. 模具是用公制/英制的配件?需要备用件吗?
Is this mold dimension measured in inches or meters? Does it 18. 模具上铭牌上的刻字内容是由你们提供吗?你们什么时候可以这Will you provide the engraving content of the plate of this 19. 可否提供此模具生产时,注塑机的型号及相关资料。如:啤机大Can you provide the type of injection machine and other rela Such as the boss dimension, the hole's dimension of the ejec machine and so on.
20. 这个问题我需要同其它同事商议会再答复你。
I need to discuss this problem with the other colleagues and 21. 我们将尽力达成你的计划,如有异常,会及时通知你。
We will try our best to complete your plan, if there are any immediately.
22.这个产品的长度为330.12MM,宽度为78.96MM,高度为45MM.胶厚为2M The length of this part is 330.12MM, Width is 78.96MM, heigh 23. 现在到了吃午钣的时间,我们下午再继续好吗?
It is time to have lunch, let's discuss this project later t 24.和滑塊干涉的倒勾請加料填平至滑塊可以順利滑動
(The undercut area interferes with the slide block and needs
25. 加肉太多    (The thickness added is too thick.)
26. 加肉面積太大 (The thickening area is too wide.)
27.GATE位置移位 ( The gate position is moved.)
28. 滑塊拆的位置 (The split line of slide block or the
29. 此處有尖角,填充困難 (It is hard to fill this area due to
30. 此處鋼材太薄,強度不足而且不容易冷卻
(The strength of this area is too weak and it is hard to coo 31. 圓柱特徵要有一半圓不可以拆在滑塊上,以免粘滑塊造成拉白,拉(We avoid designing the semicircle of the cylinder on the sl
apart or cause drag marks.)
32. 此處做斜銷在作動時會削到成品肉厚
(The part will be damaged if we make the lifter in this area
33. 這個面是裝配面,不能加料
(This is a critical surface where we cannot add additional m
34. 此處料位太厚,會有縮水,建議減料改善
(Because of the shrinkage of the thickness, we suggest reduc
35. 此面是不是外觀面,此處做滑塊的話會有夾線,是否可以接受 (Please confirm whether it is a critical surface or not. Als
36. 此處有倒勾,能否減料,使公母模靠破,不做滑塊和斜銷
(Please confirm whether we can reduce material to the area w
37. 請盡快確認這種拆模方式和結構,否則會影響模期
(Please confirm the issues of Parting line, he lead-time will be extended.)
38. 此面是否有特殊要求,能否有頂針印
(Please confirm whether it is a critical surface or not and
39. P.L面開在此處,模具上會有尖角和刀口,對模具壽命有影響 (There are sharp edges if we set the parting line here, It w
40. 加大拔模角,以便脫模順利  We suggest enlarging the draft
41. GATE做在此處的話有兩個缺點:1.蓋子打開時可以看到GATE的修剪(There are two problems if the gate is to be designed in thi a). It is easy to see the gate mark when you open the c b). The ejectors are unbalanced when two lifters are on
42. GATE做在此處的話.蓋子打開後看不到GATE的修剪部位
(The gate mark is not visible if the gate position is design
43. 如果GATE一定要做在你們指定的位置的話,那還不如做在這一側,44. 在此處GATE做潛頂針的話,背後的外觀面會有沖料痕,而且成品又(If the design of the gate has to be a sub. Gate, then the b serious flow marks due to the black color.)
22. P.L開在此處不合理,模具加工困難,P.L應改為和圖示的一樣 45。产品粘母模的機會很大,能否在公模加倒勾,拉料頂針或者公模保(If you insist that the gate position has to be like th design, then we would further (This area is not suitable to have a Parting line becau more complicated;
46.此處料厚段差很大,成品表面會有應力痕,是否接受
(Please confirm whether it is acceptable to have stress line
47. 請注明何處為外觀面,能否提供2D圖和注意事項
(Please advise where the critical surface is. Please also pr dimensions. )
48. 紅所示處是有問題的地方,請特別注意
(Please note the red highlights because those areas have pro
49. 成品設計此處有問題,建議如下圖所示修改
(We would suggest using the attached part design as the curr
50. 此處改為一個球形的凹槽 (We suggest modifying it as a glob
51. 圓柱特征要有一半不可以拆在滑塊裡,以防拉斷 (this issue is
52. 此處大滑塊上走小滑塊,小滑塊要先退,大滑塊要做延遲
(The inside small slide block will recede first and the pare
53. 滑塊要用液壓油缸抽芯以保証開合模順序
(The slide pins will use an oil cylinder to assure that the
54. 這個面有裝配,加料的話裝配時會頂住,如圖所示
(We cannot add material to this surface because it will inte
55. 可降低斜銷面,增加成品些許肉厚來做變化
(To descend the surface of lifter in order to thicken the pa
56. 一半做斜銷,一半做自然
(One half side will have the lifter and the other half will
57. 此處兩個柱子重疊,有倒勾,不能做自然,要做SLIDE
58. 此處強迫頂出 (This area needs force ejection.)
59. 公模兩段開模,這個地方先退 (Here will be a double ejectio
60. 此處做鑲件會有夾線,能否接受
Please confirm whether it is acceptable that there will
61. 此面公母模1度靠破,會有段差,可否接受
(Please confirm whether it is ok to have mismatch to the are
62. 這個尺寸能否加大 (Please confirm whether we can enlarge t
63. 此處加一個凹槽,膠片的彈出效果會更好一些,試模後看裝配的效(It will affect the elastic of the film better if we add a r (There is possible sticking on cavity; therefore, pleas undercuts,
snatch pins or leave coarse E.D.M. on the core to snatch the (These two bosses are overlapping with undercut therefo as solid. We
64. 此處有倒勾,建議將剖面線所示部位CUT即可避免此處的倒勾(There is an undercut here, we suggest cutting out the indic 65. 成型後SUB GATE要修平
(The gate (sub gate) needs to be trimmed evenly after being 66. 此處倒勾先垂直頂出,之後再手動取出
(This area of the undercut needs to be ejected vertically, t 67. 這兩個面都有滑塊,GATE改在此處改不到
semicircle
(The gate is not suitable in this area because there are two 68. 此處加做一個旋轉GATE,射出時方便調整成品的品質
(We would suggest placing a runner shut-off insert to adjust 69. 此倒勾在滑塊上強迫脫模,倒勾是否可以減小到0.6
(This undercut will be force ejected out, Please confirm whe 70. 此柱子無法脫模,請確認是否是在轉圖時錯位,能否提供客戶的原(This boss is not releasable. Please check the file again an original draft
71. 此柱子是實心的,會縮水 (This boss will shrink because it
72. 這個面是否要咬花,咬花番號是什麼,最小的拔模角要多大(Please confirm whether this surface needs to be textured or 73. 這個面是否要打光,貼標簽
(Please confirm whether this surface needs to be polished an 74. 紅顯示的幾個面拔模角太小,出模時會拉傷,建議加大拔(The red highlighted area has a problem of a small draf thedraft to avoid causing drag marks on the part.)
75. 此RIB太薄,會填充不足 (This rib can not be filled properl thin.)
76. 此RIB太厚,會縮水 (This rib will have a shrink problem be
77. 此處倒勾出模困難,建議先不做倒勾,成型後再二次加工,但要做(There are problems with this current design, we recommend d alternative but there will be additional costs.)
78. 柱子底部都要做火山口
(The base of all bosses require a crater to avoid shrinkage.
1.镶件,P.L.面有充足排气坑,P.L.面要开环形排气槽,并能将气体排Insert/PL should have adequate venting, PL should have aroun 79.顶棍孔镶件端面距离底板面0,5mm,攻m20牙;
the surface of KO insert should below bottom plate 0.5mm,thr 80.回针,中托司与模胚部份避空0.5mm;
83.底面板均要有隔热板,DME规格1/4厚;
Top/Bottom plate must have insulator plate, DME standard 1/4 84.吊环要在模具的重心(保证吊模时的平衡);
Eyebolt should on the center of the mold(for balance)
85.吊模螺丝的位置要在前/后模部份的重心,保持平衡;
The eyebolt position on the cavity/core side should on the c 86.唧嘴分试模唧嘴/走模唧嘴;
Sprue type: Trial/Delivery
87.喉塞选用:NPT规格;
Plug use NPT spec.
88.中托司采用HASCO滚珠形式.    Use HASCO ball EGP
89.水咀采用法国标准:1/4"的水咀写:RPL08-1151
Jiffy Use French Standard: 1/4" mark:RPL08-1151
90.全部使用英文和英制单位 All in English& Imperial Unit
91.请检查内模尺寸有否乘缩水? Are part dimensions to print plu
92.凡有电线通过的角位要改为R角,是否完成 All wires protected
93.所有替换的元件必须是标准件。All replaceable component
94. 是否加啤塑总计器?Add shot counter?
95.一个复杂的模具,设计经过周详考虑,成功地克服了各种设计上的
A complicated mould with thorough design consideration to ov
96.所有移动的零件应使用硬钢料,行位必须用硬垫板和硬线条,而且All moving components should use hardened steel: all slides 97.BOM的内容应包含运水接头,顶针和自制的零件.
BOM including water fittings, ejectors &custom components.
98.若没有运水回路,斜顶为铍铜。BeCu for lifters if w/o water
99.对应的部件在前、后模平面视图中镜像Corresponding compo 100.有否省光就出模?
Check polish for line of draw finish?
Core pull slot mechanism installed and O.K.
101.模具须用多大吊机才可搬动Crane capacity and loading cleara 102.经流道及变形电脑模拟分析。Conduct mold flow &mold warp an 103.散件图或3D模具图Component and/or 3D mould design drawing. 104.若尺寸不重要,适量冷却也可。Cooling less important when d

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系QQ:729038198,我们将在24小时内删除。