石油钻井常用词语及缩写汇总
一、标准钻井日报表容
Official Daily Report Form
1钻井日报表Daily drilling report
2.报表号 Report No.
3.图例(说明) Legend
4.公制度量标准Metric expressions
5.所有长度均采用米制,并取两位小数
All lengths expressed in metres to two decimal places
6.泥浆密度——kg/m3 Mud density = kilogram per cubic meter (kg/m3) 7.泥浆泵冲程 mm pump-stroke length=millimetre(mm)
8.悬重——十牛顿Weight of string=deca newton(daN)
9.单位长度质量——kg/m Linear mass=kilogram per meter(kg/m)
10.粘度——秒/升Viscosity=second per litre(s/L)
11.排量——m3/min Flow rate=cubic metre per min.(m3/min)
12.压力梯度——千帕/米Pressure gradient=kilopascal per me-tre(kPa/m)
13.屈服点——帕Yield point=pascal(pa),(y. p.)
14.塑性粘度——毫帕*秒Plastic viscosity=millipascal sec-ond(mPa .s), (P.V.)
15.切力—帕Gel strength=pascal(pa)
16.大绳完成的功——兆*焦尔Work completed by wire
line=megajoule(MJ)
17径和外径——毫米Inside diameter and outside diame-ter=millimetre(mm)
18.泵压——千帕Pump pressure=kilopascal(kpa)
19.钻压:指重表以十牛顿记录Weight on bit ; Indicator will record decanewton
20.租地 Lease
21.井号 Well No
22.井段 Well number
23.日期 Date
24.年Yr. 月MO. 日Day
25.施工者(单位)Operator
26.承包者(单位)Contractor
27.钻机编号 Rig No.
28.施工单位代表签名 Signature of operator’s representative
29.承包单位队长(技师)签名Signature of contractor’s toolpusher 30.钻杆尺寸(规) D. P. size
31.每米重 kg/m
32.钢级 Grade
33.接头外径 Tool JTO.D.
34.扣型 Type thread
35.钻柱号 String No.
36.泵编号 Pump No.
37.泵生产厂家 Pump manufacturer
38.驱动方式 Type of drive
39.冲程Stroke length
40.时效分析—小时 Time distribution=hours
41.序号 Code No.
42.工作容 Operation
43.早班、Morn.=morning tour 中班、Day=day tour 晚班Eve.=evening tour
44.安装与拆卸 Rig up and tear down
45.纯钻 Drill actual
46.扩眼 Reaming
47.取心 Coring
48.循环与处理泥浆 Condition mud & circulate
49.起下钻 Trips
50.保养钻机 Lubricate rig
51.检修钻机 Repair rig
52.倒大绳与滑大绳 Cut off drilling line and slip drilling line 53.测斜 Deviation survey
54.吊测 Wire line logs
55.下套管与固井 Run casing and cement
56.候凝 Wait on cement
57.安装防喷器 Nipple up B.O.P.
58.防喷器试压 Test B.O.P.
59.中途测试Drill stem test
60.打水泥塞(固堵)Plug back
61.挤水泥 Squeeze cement
62.打捞 Fishing
63.定向工作 Dir. work
64.完井 Completion
65.射孔 Perf’R’T’N(Perforation)
66.起下油管TBG Trips
67.处理 Treating
68.抽吸 Swabbing
69.测试 Testing
70.其它 Addit’N’L
71.合计 Total
72.一天工作摘要(只用于办公室)Day work summary(office use only) 73.组织停工小时 HRS. Standby
74.总工作天数 Total days work
75.从开钻起天数 No. of days from spud
76.累计钻进小时 Cumulative rotation HRS
77.总泥浆费用 Total mud cost
78.钻具结构 Drilling assembly
79.交班时At end of tour
80.钻头 Bit
81.扶正器外径 STB O.D.
82.扩大器外径 RMR OD
swabbing83.钻铤径、外径 D.C.I.D., OD
84.钻杆立柱数Stands DP
85.钻杆单根数 Stingles D.P.
86.方入 Kelly down
87.悬重 (Force)WT of string daN 88.钻头记录 Bit record
89.钻头编号 Bit No.
90.钻头尺寸(规)Bit size
91.制造厂家 MFG
92.型号 Type
93.喷嘴(毫米)Jets(mm)
94.顺序号Ser No.
95.起出井深 Depth out
96.下入井深Depth in
97.总进尺 Total meters drilled 98.使用小时 Total HRS run
99.压力降(千帕)Pressure drop (kPa) 100.泥浆记录 Mud record
版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系QQ:729038198,我们将在24小时内删除。
发表评论