Project:
验试验计划
Date:
2022.02 .08
Location:
Inspection Test Plan
Rev.
02
Owner:
Contractor:
        380吨/年植物功能性材料项目
检验试验计
Inspection Test Plan
编制
Prepared:
审核:
Review:
批准:
Approval:
××××××建设有限公司
2022/02/08

总包LOGO
Inspection & Test Plan
验试验计划 ( ITP)
建设单位:
Conrtactor Name承包商名称:
        380吨/年植物功能性材料项目
ITP Section No.: 0.0 施工前Pre-construction(),1.0土建Civil(),2.0 钢结构Structurl Steel(),3.0设备 Equipment(),4.0 管道Piping(),5.0 电气Electrical(), 6.0 仪器仪表Instrument(),7.0 系统移交SystemTurnover()8. 工程竣工验收Final Acceptance Of The Project()
ITP No.
INSPECTION ACTIVITY
验收项
APPLICABLE
PROCEDURE
序或者规范
ACCEPTANCE
CRITERIA
验收标
GRADE
(Note)
验收等
RESPONSIBILITY
(Note)
INSPECTION
FREQUENCY
验收频
QUALITY RECORD
/VERIFICATION
DOCUMENT 验收表
Contr actor
Ashlan d
QSC
SQIB
0.0 Pre-construction施工前准备
0.001
Certification of contractor
工单位资质和证书
Contractspecification 同要求
Chinese Business Law 政府相关法规
A
QR
R
R
R
Before Construction 施工开始前
Review Record 报审记录
0.002
Construction execution plan review 工组织设计审查
Contractspecification 同要求
Contractspecification 同要求
A
I/R
R
R
R
Before Construction 施工开始前
Review Record 报审记录
0.003
QA/QC Plan review
合同质量计划审查
Contractspecification 同要求
Contractspecification 同要求
A
I/R
R
R
R
Before Construction 施工开始前
Review Record 报审记录
0.004
Design explanation
设计交
Contractspecification 同要求
Contractspecification 同要求
A
I/R
R
R
R
Before Construction 施工开始前
Joint Review Record 会审纪
0.005
Joint review of construction drawings 施工图会审
Contractspecification 合同要求
Contractspecification 同要求
A
I/R
R
R
R
Before Construction 施工开始前
Joint Review Record 会审纪
0.006
Audit of construction proposal
专项方案审
Contractspecification 同要求
Contractspecification 同要求
A
I/R
R
R
R
Before Construction pouring施工开始前
Review Record 报审记录
0.007
Technical Clarification
方案技术交
Contractspecification 同要求
Contractspecification 同要求
B
I/R
R
R
R
Before Construction 施工开始前
Review Record 报审记录
0.008
Personnel certification and experience
人员资质审查
Contract specification 同要求
Contract specification/QC Plan同要求/质量方案
A
QR
R
R
R
Before commencement 开工前
Review Record 报审记录
0.009
Measuring Instrument Inspection 周期检定计量器具报验
Contract specification 同要求
Quality Calibration 质量校验
A
QR
R
R
R
Before commencement 开工前
Review Record 报审记录
ITP No.
INSPECTION ACTIVITY
验收项
APPLICABLE
PROCEDURE
序或者规范
ACCEPTANCE
CRITERIA
验收标
GRADE
(Note)
验收等
RESPONSIBILITY
(Note)
INSPECTION
FREQUENCY
验收频
QUALITY RECORD
/VERIFICATION
DOCUMENT 验收表
Contr actor
Ashlan d
QSC
SQIB
0.010
Equipment Inspection
工设备进场报验
Contract specification 同要求
HSE Release Inspection HSE
A
QR
R
R
R
Before commencement 开工前
Review Record 报审报告
0.011
Commencement report
开工报告
Contractspecification 同要求
Chinese Business Law 政府相关法规
A
I/R
R
R
R
Before commencement 开工前
Review Record
报审报告
0.012
Quality supervision /Safety supervision 检安检报审
Contract specification 同要求
Chinese Business Law 政府相关法规
A
I/R
R
R
R
Before Construction 施工开始前
Review Record 报审记录
0.013
Notification of Pressure Vessel and Pipe before Construction
管道施工前告知(如有)
Contract specification 同要求
Contract specification/QC
Plan
同要求/质量方案
A
QR
R
R
R
Before Construction 施工开始前
Copy of Notification
1.0    Civil  土建
1.001
Survey Of Position
程定位测量
GB50026-2007
GB50026-2007  Sec.8.
H
I
R
I/R
个单体
TJ2.2. 1
1.002
Material Site Acceptance
料进场
GB50204-2015
GB50204-2015 Sec.3.
A
T/QR
I/R
W/R
Each Batch
Review Record 报审报告
1.003
Welder Certification Qualification 焊工进场报验
JGJ 18-2012
JGJ18-2012  Sec. 1./6.
A
T/QR
R
R
Each Welder
个焊工
Copy of Certificate
1.004
Concrete Mix Design
混凝土配合比
GB50204-2015
GB50204-2015 Sec.7.3
A
I
R
R
Grade of concrete 凝土等级
Testing Report
1.005
Welding Test of Redar Joint
钢筋焊接测试
JGJ18-2012
JGJ18-2012 Sec.5.
A
P/QR
R
W/R
1 set(3Joints)for
300 nos.of
Welding Joint
300个接头测一
Testing Report
TJ2.5.7
Page 2 of 12
1.006
Compression test
抗压强度试验
GB50204-2015
GB/T50081-2002 GB/T50082-2009
GB50204-2015
GB/T50081-2002
GB/T50082-2009
B
P/QR
R
W/R
The whole project 整个工
TJ2.5. 1~TJ2.5.5
Testing Report
1.007
Field Density Test Of Backfilling 回填土含水率/干密度检查
GB50202-2018
GB50202-2018
Sec.6.3.3,6.3.4
B
P/QR
R
W/R
1 Test Per 500M2
500M21
Testing Report
ITP No.
INSPECTION ACTIVITY
验收项
APPLICABLE
PROCEDURE
序或者规范
ACCEPTANCE
CRITERIA
验收标
GRADE
(Note)
验收等
RESPONSIBILITY
(Note)
INSPECTION
FREQUENCY
验收频
QUALITY RECORD
/VERIFICATION
DOCUMENT 验收表
Contr actor
Ashlan d
QSC
SQIB
1.1  Earth and foundation地基与基础工
1. 101
Earth excavation
土方开挖
GB50202-2018
GB50202-2018 Sec.6.
A
I
R
I/R
Each monomer
每个单体
TJ4.5.1.1
1. 102
Inspection of foundation pit
地基验槽
GB50202-2018
GB50202-2018 Sec.6.
A
I
I/R
I/R
Each monomer
每个单体
TJ2.6. 14
1. 103
Foundation soil replacement
地基土换填
  GB50202-2018
Contract specification 同要求
A
I
I/R
I/R
Each area
每个区域
1. 104
模板安装
installation
Contract specification 同要求
Contract specification 同要求
A
I
W
W
    First installation
    第一次安
Extra 136
1. 105
Inspection Of Formwork Before
Concrete  Pouring
模板验
GB50204-2015
GB50204-2015 Sec.4.
A
I
R
I/R
Each Foundation
个基础
TJ4.4.1.1
1. 106
Inspection Of Rebar Before Concrete Pouring
钢筋验收
GB50204-2015
GB50204-2015 Sec.5.
A
I
R
I/R
Each Foundation
个基础
TJ4.4.2.1/TJ4.4.2.2/TJ
4.4.2.7/TJ4.4.2.8 TJ2.6. 1
1. 107
钢筋安装
installation
Contract specification 同要求
Contract specification 同要求
A
I
W
W
First installation
第一次安
Extra 136
1. 108
Concrete  Construction
凝土施工
GB50204-2015
GB50204-2015 Sec.7.
A
I
R
I/R
Each Time
TJ4.4.3.2~TJ4.4.3.3
1. 109
Inspection For Dismantle Of Formwork 拆模验
GB50204-2015
GB50204-2015 Sec.4.
C
I
R
I
Each Part
个部位
1. 110
Inspection Of Concrete
浇结构验收
GB50204-2015
GB50204-2015 Sec.8.
B
I
R
I/R
Each Foundation
个基础
TJ4.4.3.2~TJ4.4.3.3
1. 111
Secondary grouting
二次灌浆
GB/T 50448-2015
GB/T 50448-2015 Sec.5.
B
I
R
I/R
Each Foundation
个基础
TJ4.4.3.2~TJ4.4.3.3
ITP No.
INSPECTION ACTIVITY
验收项
APPLICABLE
PROCEDURE
序或者规范
ACCEPTANCE
CRITERIA
验收标
GRADE
(Note)
验收等
RESPONSIBILITY
(Note)
INSPECTION
FREQUENCY
验收频
QUALITY RECORD
/VERIFICATION
DOCUMENT 验收表
Contr actor
Ashlan d
QSC
SQIB
1. 112
Acceptance of water tank waterproof and anti-corrosion水池防水防腐验收
1. 113
Water Basin Impoundment Test
水池满水试水
GB/T 50934-2013
GB/T 50934-2013 5.4.7条
A
I
I
I/R
Each Pit
个水池
Full water test record
1. 114
Filling Soil Laboratory Test
回填压实度检测
GB50202-2018
GB50202-2018 Sec.6.3
B
P/QR
R
W/R
Each Layer
Testing Report
1. 115
Inspection before Backfilling
验收
GB50202-2018
GB50202-2018 Sec.6.3
A
I
R
I/R
个单体
TJ4.5.4.1
1. 116
Acceptance of foundation work
基础工程验收
GB50202-2018
GB50300-2013
GB50202-2018 Sec.8. GB50300-2013
A
I
I/R
I/R
R
Each work
个工程
TJ4
1.2  ROAD AND PAVING WORK  道路施工
1.201
Bedding inspection
基底标高检查/验槽
GBJ97-87
GB50202-2002
GBJ97-87 Sec.3
GB50202-2002 Sec.6.2.2&6.2.4
A
I/QR
H/R
H
Each Section
每段
TJ2.6.3
1.202
Desity Test of Sub-Grade
基底压实度测试
GBJ97-87
GB50202-2002
GBJ97-87 Sec.3
GB50202-2002 Sec.6.3.3 & 6.3.4
B
I/T
W/R
W/R
1 Test Per 1000M2
每1000M2测1组
Testing Report
1.203
Inspection of Rebar,Embedded Item Before Concrete Pouring(Concealed Work)
混凝土浇筑前钢筋及预埋件检查
GBJ97-87
GB50204-2002
GBJ97-87 Sec.4.5&4.6
GB50204-2002 Sec.5
B
I/QR
H/R
H
Each Section
TJ4.1.25
1.204
Inspection of Formwork Before Concrete Pouring
模板安装检查
GBJ97-87
GB50204-2002
GBJ97-87 Sec.4.4.1&4.4.2
GB50204-2002 Sec.4
B
I/QR
W/R
W
Each Section
TJ4.1.22
1.205
Concrete Pouring
混凝土浇筑
GBJ97-87
GBJ97-87 Sec.4.4.3~4.4.6
B
I/QR
W/R
W
Each Section
TJ4.1.27
1.206
Compressive Stength Test
混凝土强度检测
GBJ97-87
GB50204-2002
GB/T50107-2010
GBJ97-87 Sec.5.1.5&5.2.3
GB50204-2002 Sec.7.4.1&7.4.2
GB/T50107-2010 Sec.3&4
B
I/T
W/R
W
2 Set per 200m3 or one day每天或200m3,2组(1 set for standerd Curing &1 set for natural curing)
Testing Report

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系QQ:729038198,我们将在24小时内删除。