模具英语100句,收藏起来慢慢背!
All in English& Imperial Unit.
全部使⽤英⽂和英制单位
Are part dimensions to print plus shrink?
请检查内模尺⼨有否乘缩⽔?
All wires protected from sharp corners?
凡有电线通过的⾓位要改为R⾓,是否完成?
All replaceable components must be standard components.
所有替换的元件必须是标准件。
Add shot counter?
是否加啤塑总计器?
replaceableA complicated mould with thorough design consideration to overcome the numerous design contraints.
⼀个复杂的模具,设计经过周详考虑,成功地克服了各种设计上的限制。
All moving components should use hardened steel : all slides should be installed with hardend or lubricated alloy wear plates and gibs, and with positive slide retainer.所有移动的零件应使⽤硬钢料,⾏位必须⽤硬垫板和硬线条,⽽且必须有限位及定位锁。
BOM including water fittings,ejectors&custom components.
BOM的内容应包含运⽔接头,顶针和⾃制的零件.
BeCu for lifters if w/o water circuits。
若没有运⽔回路,斜顶为铍铜。
Corresponding components mirrored at core&cavity
对应的部件在前、后模平⾯视图中镜像
Check polish for line of draw finish?
有否省光就出模?
Crane capacity and loading clearance.
模具须⽤多⼤吊机才可搬动。
Conduct moldflow &mold warp analysis.
经流道及变形电脑模拟分析。
Component and/or 3D mould design drawing.
散件图或3D模具图
Cooling less important when dimensions are not important.
若尺⼨不重要,适量冷却也可。
Combine a traditional 4 cavity edge gate and a 4 cavities reverse gate mould which help to double th
e moulding capacity and reduce production cost.将⼀个标准四模腔⼤⽔⼝模具与⼀个四模腔倒转⼤⽔⼝模具结合成为⼀套可于同⼀⼤⼩的注塑机,⽣产量可增加⼀倍的层板模具,并且可降低成本。
Can be seperated into two individual moulds for moulding in two different mould shops.此模具最⼤的特式是,可将模具分开变成两套,在不同地⽅⽣产,增加⽣产的灵活性。
Consists of all standard mould components which facilitates mould maintenance.由于全套模具均利⽤模具标准零件制成,在维修及换零件上⽐较⽅便。
Die draw called out
出模⽅向的标⽰
Dimension all the opening , travel & clearance
标出前、后模距离,滑动部件滑动距离和塑件脱离的位置
DME egr. Water fittings recessed and marked?
DME egr. Water fittings recessed and marked?
是否使⽤DME运⽔接头及编号?
Delivery right side up , or in two halves?
开箱后是否容易吊出模具及是否分开前/后模运输?
Eyebolt size and balance in 2 sides
吊模孔尺⼨,平衡,4边都要有.
Ejection stroke & slide, lifter travel dimensioned
出⾏程、⾏位、斜顶⾏程的标注。
Ejection study if lifter adopted
若有斜顶,做出分析。
Ejection extended at the most
顶出到极限位置
Ejector guide pins installation .
顶针导柱的安装。
Eyebolts for inserts more than 50lbs.
重量⼤于50lbs的镶件必须要有吊模孔。
Edge gate or sprue gate requiring secondary operation acceptable.
边缘型或直⼊型⽔⼝都可以接受。
4 point in HRC different to lifters contacting or cavity steel.
斜顶和与其接触的内模或镶件在硬度上有4度的差别(HRC)。⽔⼝及⽔⼝顶针的4倍放⼤视图,按实际尺⼨标注。General ,safety and handling
常规、安全和搬运要求。
Guided ejection recommended for mould above 100 tons clamp capacity, ejector pins of 1.5mm or smaller, or ejector stroke longer than 50mm.建设模具⽤于锁模⼒超过100吨的注塑机,或有1.5mm以
下的顶针或顶出⾏程超过50mm时,
stroke longer than 50mm.建设模具⽤于锁模⼒超过100吨的注塑机,或有1.5mm以下的顶针或顶出⾏程超过50mm时,应装上顶针板导柱。
Guide pin cleared and vented?
边钉插⼊模板有否顶着及加疏⽓空?
Hot manifold wired to print and checked?
热咀电线接位有否编号?
Horn pin clearance hole?
斜边与⾏位有否空间?
Hydraulic actuated slide together with electrical limit switch.
⾏位采⽤油压推动,配合安全电制。
Heaters fitted+0.002/-.000, leads tagged and connected to terminal.
热嘴装配,电线源头、尾有否安装稳固。(+0.002/.000)
Inserts keyed and numbered to prevent incorrect assembly.
镶件定位和编号以防⽌不正确的组装。
Jaw angle than angle pins(<25 degree).
斜⾯⾓度要⽐⾏位斜边⾓度⼤3度(<25度)。
Keep enough space to run waterline at slide /lifter/major inserts.
在⾏位、斜顶、主要镶件处保留⾜够位置(空间)布置⽔槽。
Lifter angle less than 15 degree.
斜顶⾓度⼩于15度。
Lifter rods dia, less than 1".
斜顶杆直径不能少于1"。
Limit switch in tact and protected.
是否已安装限位制?
是否已安装限位制?
Moldbase and steel dimensioned
模坯和钢料号的标注
Minimum 5 deg.for shut-off.
斜顶镶件最⼩5度插穿。
Mechanism for sequence
动作机构是否正确?
Mold safety straps installed and painted red?
是否已安装安全带及喷上正确颜⾊在模坯上?
Mould flow and simulation should be carried out for the best gate location, filling analysis, pressure distribution and heat distribution.
适宜应⽤模拟的模具注塑过程,注射分析、压⼒分布及温度分布以确定最佳⼊⽔位置、流道尺⼨和疏⽓位置等。
Mould should be designed with maximum cooling and with appropriate amount of ejection points.
模具在设计上要做到尽快冷却,上、下内模⾼温点应该有个别的冷却,应有适量顶针。
Mould should be able to run fully automatic. Large part should be picked up by robot.
模具能够全⾃动⽣产,⼤的零件应由机械⼿拿出。
Mould should be tested to meet a defined Cpk quality standard.
模具经过测试,符合预定的Cpk质量标准。
Mould should have safety features to protect accidental damage, incorrect assembly and set up of mould.
模具应具备可以预防意外损害及错误安装等安全特性。
Mould halves requiring accurate alignment of core and cavity, and shut off should have appropriate part line locks.
上、下模需要精确配合或有擦位的地⽅,模具⼀定要有直⾝锁。
Mould requiring heating should have insulator plate.
需要加热的模具,必须有隔热板。
版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系QQ:729038198,我们将在24小时内删除。
发表评论