第一道工序:装阀芯、压阀盖、铜管
The First StepCartridge cartridge nut and brass elbow assembling
4  1
Step 1/4
装配零件清单Component List
序号
Code
物料品名
Name
物料品号
Reference
规格型号
Specification
单位
Unit
组成用量
Quantity
1
厨房壳体body
40133051
ф40
piece
1
2
耐摩圈 wearable joint
16120P
φ46*φ42*1.3
piece
2
3
密封圈 seal ring
16066P
133001 ACS标准)
piece
2
4
阀芯 flat cartridge
12020P
φ40带网-两档平脚-NF
piece
1
5
压阀盖 cartridge nut
17006P
M42X1.5
piece
1
6
S形管s brass elbow
09037C-8
RS DATE NF IIB DVGW PA-IX 18631/IA
piece
1
匹配函数公式
备注:
Remark:
   
第一道工序:装阀芯、压阀盖、铜管
The First StepCartridge cartridge nut and brass elbow assembling
4  1
Step 1/4
使用设备:
Equipment
压阀盖扭力机、抹油机
Torque Machineoil apply machine
工具及规格:
Assembling Equipment
扭力机夹具、
Fixture on the torque machine
工艺参数:
Parameter of the Equipment
压阀盖扭力:11-15N.m
Cartridge Nut Assembling Torque11-15N.m
检验频率:
Inspection frequency
1/1目测
1/1Visual
检验项目:
Self-Inspection
壳体、铜管表面是否有划伤、擦毛、砂眼及电镀不良;Check whether there is scratch, Trachoma or other plating defect of the body and brass elbow
实施时间:
Each production time
最大产量:
Maximum day output
箱内数量:
Quantity per Foam box
12
产量/时:
output/h
饱和度:
Worker saturation
其余公差:
Other tolerance
/
安装工夹具:
Fixture adjustment timejar混淆加密
15min
拆卸工夹具:
Fixture disassemble time
15min
设备清理:
Equipment clean time
10min
操作程序Operation Process
1. 将阀芯置入壳体内,阀芯的定位脚与壳体的定位孔一定要对齐,并将阀芯压到位。Put the cartridge in the body and make sure the fixing legs enter the fixing holes of the body well in position.
2. 将压阀盖用手轻轻旋入壳体,旋1-2道螺纹。然后将工件放在旋扭机的夹具上,按启动按扭,设备开始工作。当压阀盖旋紧后,设备自动停止复位,取下工件。Screw cartridge nut on the 1-2 screw thread of the body and put it on the fixture of the torque machine, start the machine to tighten the nut. The machine will stop automaticaly and take off the body for next step.
3. 将耐磨圈装到壳体上,然后再将两个密封圈分别放入壳体密封圈槽中,用刷子在O型圈上抹上润滑油以利于装配。注意:要将(两个)密封圈的开口槽口对口。Screw mount one POM ring and two EPDM sealing joint and apply the lubracation oil on the joint. Note: The sealing joint and the according gap of the body shall adjust very well.
4. Sposition of the day型管压入壳体,再放上个耐磨圈,将壳体底圈用手旋紧(注意要将S型管装到位,并观看耐磨圈有没有挤出来),然后再转动S管是否有异声;Mount the S- high spout and one more POM ring and screw on the base.(Note: Make sure the POM ring will not extrude and no noise shall occur after revolving the spout) .
第二道工序:测试,装水嘴、手柄、标识盖
The Second SteptestingAeratorhandle and index assembling
4  2
Step 2/4
装配零件清单Component List
序号
Code
物料品名
Name
物料品号
Reference
规格型号
Specification
单位
substr函数修改用法sqlUnit
组成用量
Quantity
1
M24*1出水嘴(B)Aerator
11028C
纽珀40460503301--NNF
piece
1
2
装饰盖 cover
13001C
ф40
piece
1
3
RS正标手柄handle
01040C-9
φ40
piece
1
4
螺丝Screw
29001P
M5*8
piece
1
5
标识盖Index
21001P
φ6.8
piece
1
备注:
Remark:
第二道工序:测试,装水嘴、手柄、标识盖
The Second SteptestingAeratorhandle and index assembling
4  2
Step 2/4
使用设备:
Equipment
气测机
Air testing machine
工具及规格:
Assembling Equipment
22扳手、气动扳手、橡胶锤、测试机夹具
22 spannerPneumatic spannerrubber sinkertesting fixture
工艺参数:
Parameter of the Equipment
工作压力:4±1bar;设备输入压力:5±1bar
Working Pressure 4±1BarPneumatic Spanner Input Pressure 5±1Bar
检验频率:
Inspection frequency
1/1目测
1/1Visual
检验项目:
Self-Inspection
手柄、壳体、装饰盖是否被划伤、外观缺陷
Check whether there is any plating defect on the handle, body and plastic cover
实施时间:
Each production time
最大产量:
Maximum day output
箱内数量:
Quantity per Foam box
12
产量/时:
output/h
饱和度:
Worker saturation
其余公差:
Other tolerance
/
安装工夹具:
Fixture adjustment time
15min
拆卸工夹具:
Fixture disassemble time
15min
黄页动漫网站直接看
设备清理:
Equipment clean time
10min
操作程序Operation Process
1. 工件放在夹具上,双手同时按两边的绿按纽,汽缸下降就位方可松手, 测试完后,取下工件。良好的工件继续下面操作,劣质的工件放入黄箱子中,待检验人员查明具体原因。Put the body in the fixture and press the two buttons, If the body is not ok, it will be placed in the reparation zone or proceed with the next step. Identify the defects in different box(Yellow box hold the bodies which can be restored and Red box hold the reject bodies)
2. 将水嘴套旋入弯管水嘴螺纹中,旋紧后用22扳手旋紧注意:水嘴套电镀表面不要被划伤,出水嘴装到管子上不能出现倾斜.Screw the aerator in the high spout and tighten it by the 22 spanner after. Note: The surface of the aerator shall not be scratched and no angle shall occur between the aerator and the high spout.
重定向和转发的区别英语
3. 将装饰盖用手旋到压阀盖上,旋紧且与壳体配合紧密。注意:装饰盖与壳体的配合要好(不能有明显的偏位)Screw the cover on the cartridge nut and tighten it with the body. Note: The cover and the body shall adjust well.
4. 固定好阀芯与手柄装配的位置,注意:阀芯与手柄不能装错位.Fix the position between the cartridge and the handle Note: The position of the handle shall be adjusted well with the cartridge.
5. 将内六角螺钉放在气动扳手扳头上,然后通过标识盖孔伸入固定孔,注意气动扳手必须与螺丝垂直,然后启动气动扳手旋紧,注意气动扳手不要划伤工件.Place the hexagon screw on the pneumatic wrench and extend it in the fixting hole through the index hole. Start the pneumatic wrench and screw it down. Note: Do not scratch the product by the pneumatic spanner.
6. 将标识盖放入(手柄)标识盖孔,用橡胶锤敲紧,注意标识盖左红右蓝方向端正,标识盖必须要装到位.Place the index in the index hole and knock it down with the rubber sinker. Note: Rectify the position of the index to make sure the red signal is on the left and the blue signal is on the right.

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系QQ:729038198,我们将在24小时内删除。