<质量保证协议书>
Form132
机密等级    :    普通
窗体变更履历
Revision
Change Item
Change By
Issue Date
0
合并DG/WJ/CQ/LED质量保证协议书
统一在台北发行,变更履历参照原(4厂)文件
Mary_Yang
2014/2/20
质量保证协议书
(Quality Agreement)
质量保证协议书,依照XXX股份有限公司 (“甲方”)                 (“乙方”)之间的产品订购合同/协议(协议),自                  MM/DD, YYYY有效。质量保证协议书的内容与采购协议的条款如有相冲突或相矛盾的部分,以本质量保证协议书为准。
This Quality Agreement (“AGREEMENT”) is effective from                    (MM/DD, YYYY) according to Purchase Agreement and entered into between CHICONY POWER Technology Co., Ltd.(hereinafter referred to “CHICONY POWER”)
In the event of any discrepancy in AGREEMENT and any provisions in Purchase Agreement or Purchase Order, the AGREEMENT shall prevail.
本质量保证协议书适用于XXX 及上述各公司现在与未来在国内外所组设之任何公司、办事处、工厂、关系企业及()其他营业组织。
本质量保证协议书有中英文两种文字,如中英文有争议时以中文为准
This Quality Agreement was written by Chinese and English, in the event that there is any discrepancy between these two version, Chinese version shall prevail.
目次 (Contents)
1. 目的 (Purposes)
2. 范围 (Scopes)
3. 定义 (Definitions)
4. 质量代表 (Point of Contact)
5. 一般要求 (General Requirements)
6. 质量目标 (Quality Goals)
7. 检验标准 (Inspection Criteria)
8. 技术支持 (Technical Support)
9. 包装方式 (Packing Methods)
10.不合格品处置 (Non-conforming Products Dealing)
11.其他 (Others)
Attachment1 CHICONY POWER Components VLRR Target (DPPM)
1. 目的 (Purposes)
确保甲方之供货商知悉和遵循甲方质量规范和标准,以生产和提供符合甲方电源供应器需求之产品,创造双赢局面。
(This AGREEMENT specifies the CHICONY POWER quality requirements for Supplier understanding and complying with CHICONY POWER’s quality standard and criteria in order to produce and deliver the defect-free products to CHICONY POWER, then create win-win relationship.)
2. 范围 (Scopes)
所有生产或提供甲方零组件的本地及海外供货商均适用之。
(This AGREEMENT apply to all local or overseas supplier which manufactures or provides services, component and/or products to CHICONY POWER.)
3. 定义 (Definitions)
4M: manmachinematerialmethod (人、机、料、法)
ANSI: American National Standards Institute (美国国家标准机构)
AVL: Approved Vendor List (合格供货商名录)
BOM: Bill of Materials (物料清单或材料表)
CE: Component Engineering (零件工程)
CIP: Continuous Improvement Plan (持续改善方案)
CPT: Chicony Power Technology(accepted什么意思中文光电能的简称)
DPPM: Defect Parts Per Million (每百万分之一的不良产品数)
ECR: Engineering Change Request (工程变更需求)
GP: Green Product/Partner (绿产品/绿伙伴)
HF: Halogen FreeFollows HPT-01-043, section 4. & 5.
IQC: Incoming Quality Control (进料质量管理)
ISO: International Organization for Standardization (国际标准化组织)
LF: Lead FreeFollows HPT-01-043, section 4.
MTBF: Mean Time Between Failures (平均失效间隔时间)
ORT: On-going Reliability Test (可靠度测试或是信赖度测试)
PMP: Process Management Plan (制程管理计划,即QC工程图)
QA: Quality Assurance (质量保证)
QBR: Quarterly Business Review (季度经营审核)
RoHS: Restriction of the use of certain Hazardous Substances (Follows HPT-01-043)
SQE: Supplier Quality Engineer (供货商质量工程师)
SQM: Supplier Quality Management (供货商质量管理)
UL: Underwriters Laboratories (是美国第一家产品安全标准发展与认证的机构)
VLRR: Verified Line Reject Rate (在线淘汰率)
4. 质量代表 (Point of Contact)
乙方要指定一员能够协调乙方研发、制造与品保单位的人员,作为对甲方的品保负责人,负责协调处理与甲方进行技术和品保合作的日常事务。甲方指定甲方的SQM为乙方的质量管理接口单位。
(SUPPLIER shall assign one person who is in charge of integrating SUPPLIER’s R&D, manufacturing and QA staffs to deal all general technology and quality issues with CHICONY POWER. CHICONY POWER also assigns SQM as the sole window for dealing quality issues with SUPPLIER.)
甲方 (CHICONY POWER)
乙方 (SUPPLIER)
姓名 (Name):
姓名 (Name):
职称 (Title):
职称 (Title):
电话 (Tel. No.):
电话 (Tel. No.):
Email:
Email:huwu@sunghopower
5. 一般要求 (General Requirements)
5.1 乙方之产品质量管理体系应至少必须获得ISO 9000之认证,以期保证其供应之产品能够满足甲方的质量规范。
(SUPPLIER shall at least undertake to introduce and maintain a modern quality management system, e.g. ISO 9000, for the purpose of fulfilling CHICONY POWER’s quality standard.)
5.2 变更管理 (Change Management)
5.2.1 乙方如果发生产品设计或规格变更时,须提前至少一周以或书面形式向甲方研发部提出工程变更需求通知,甲方零件工程人员将对变更进行认证。乙方在没有得到甲方零件工程人员的或书面的正式认可前,包括但不限于ECN/PCN(工程和制程变更)等,不得变更在供产品规格。若甲方仅口头通知变更而无书面承认者,乙方有权拒绝接受变更。乙方不得以样品已获甲方相关部门承认规避责任。如因此无承认之变更致使甲方受损者,乙方将无异议赔偿甲方。
(SUPPLIER shall submit ECR to CHICONY POWER’s R&D Department by email or in writing. at least within one week prior to component design change, and CHICONY POWER’s CE Department will verify this change. SUPPLIER is NOT allowed to execute any change on existing product specification prior to receiving any confirmed approval notice from CHICONY POWER’s CE Department by email or in writing. SUPPLIER has the right to reject any oral change notice from CHICONY POWER. SUPPLIER must bear and reimburse all CHICONY POWER’s losses without objection resulted from this unapproved change, and SUPPLIER will be NOT evade the responsibility even samples have been approved by CHICONY POWER.)

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系QQ:729038198,我们将在24小时内删除。