APQP    Advanced Product Quality Planning           产品先期策划
AIMS   Automated Issues Matrix System              自动化问题矩阵系统
APR     Annual Percentage Rate                    年度百分率
ASN      Advanced Shipping Notice                  提前发货通知
BIW      Body In White                            白车身
BOM    Bill of Material                            材料单
BP     Business Plan                              商务计划
BU     Build Up                                组建
CC     Change Cutoff/Critical Characteristics          量产切换阶段/关键特性
CCL      Conveyance Contents List                  运输货物内容条款清单
CCA    Covisint connection and Administration        convisint连接与管理
CDS      Component Design Specification              零件设计规格
CMMS  Common Manufacturing Management System.    共同制造管理系统
CP     Confirmation Prototype                     确认原型
CP-C    Confirmation Prototype – Craftsmanship        技术确认
CP-F    Confirmation Prototype - Functional           功能确认
CB/IB    Continuous Build/Integrated Build             连续安装/整装
CPE    Chief Program Engineer                      主要项目工程师
CPSC    Corporate Product System Classification        公司产品系统分类
DFA    Design for Assembly                        装配性设计
DFM    Design for Manufacturing                      生产性设计
DFMEA  Design Failure Mode and Effects Analysis        设计失效模式及后果分析
DMAR  Design/Manufacturing Assembly Readiness        设计/制造装配准备
DV      Design Verificationdesign翻译                          设计确认
DVP    Design Verification Plan                      设计确认计划
DVPR    Design Verification, Plan and Report            设计确认、计划及报告
DVPSOR  Design Verification, Plan and Sign-off Report    设计确认、计划及完成报告
EAO    European Automotive Operations                欧洲汽车运行
EASI    Engineering and Supply Information            工程及供应资料
ESTA    Early Sourcing Target Agreement                早期选点目标协议
ESWP    Early Sourcing Workplan.                      早期选点工作计划
FAP      Ford Automotive Procedure                    福特汽车程序
FCPA    Ford Consumer Product Audit                  福特消费者产品评审
FDVS    Ford Design Verification System                  福特设计确认体系
FEU    Field Evaluation Unit                          现场评估单元
FMA    Failure Mode Analysis                          失效模式分析
FMEA  Failure Mode Effects Analysis                    失效模式效果分析
FPDS    Ford Product Development System                福特产品开发系统
GEMSS  Global Engineering Management Support System    全球工程管理支持系统
GSEC    Global Supplier Electronic Communication          全国供应商电子信息系统
HTFB    Hard Tooling Functional Build                    工装功能验证
IR       Implementation Ready                          准备实施
IPD     In Plant Date                                  交货日期
J1      Job#1 Achieved                                达到量产
KO      Kick-Off                                      项目启动
LR      Launch Readiness                              投产准备就绪
LS      Launch Sign Off                              投产签收
MMSA    Material Management System Assessment        物料管理评估系统
MP&L    Material Planning and Logistics                  材料计划及后勤
MRD      Material Required Date                        材料需求日期
MY      Model Year                                   模范年
OCM    Operating Committee Meeting                    营业委员会议
OPD    Ongoing Product Development                    制作中产品开发
PA      Program Approval                              项目批准
PD      Program Definition/Product Development          项目定义/产品开发
PFMEA  Process Failure Mode and Effect Analysis          过程失效模式及效果分析
PH      Proportions and Hardpoints                      比率和硬点
PIST    Percentage of Inspection Points Satisfying Tolerance  检测点合格率
PMT    Program Module Team                          项目模块组队
POP    Pay on production                              线上直供
PPM    Program and Pre-Production Management            项目及生产前管理
PR      Product Readiness                                产品准备
PS      Final Program Status                              最终项目状态
PSW    Parts Submission Warrant                        零件提交保证
PV      Production Validation/Plan View                    生产确认/平面图
PVT    Plant Vehicle Team                              车间车型队
QOS    Quality Operating System.                        质量操作系统
QR      Quality Reject                                  质量不合格品
R&R    Repeatability and Reliability                      重复性及可靠性
SC      Significant Characteristics                          重要特性
SCM    Supply Chain Management                          供应链管理
SC      Strategic Confirmation                            战略确认
SI      Strategic Intent                                  战略目的
SIM    Supplier Improvement Metrics                      供应商改进指标
SOW    Satement Of Work                                工作表
SPC    Statistical Process Control                          统计过程控制
ST      Surface Transfer                                  表面转换
STA    Supplier Technical Assistance                        供应商技术协助
TBD    To-Be-Determined                                待定
TGR    Things Gone Right                                运行正常
TGW  Things Gone Wrong                                运行出错
TTO    Tool Try-Out                                     试生产
VTTO  Vendor Tool Try Out                              供应商工装调试
VO    Vehicle Office/Vehicle Operations                    车辆办公室/车辆运行
WAM  Web Access Module                                网络访问模数
1PP    First Phase of Production Prove-Out                  首期生产验证