附录
The strategy and technique that bids to quote
Bid to quote the victory or defeat of the competition, can win a mark, not only be decided by the competitor's economic power and technique level, but also still Be decided to compete whether strategy exactitude and bid to quote of technique usage whether properly.Usually under the circumstance, other condition homologies, quote to lowestly usually win. But, this offer that isn't absolute, have isn't high, but still keep canning not getting the trust of inviting bids the unit, its reason lies in bid the unit could not lift to be advantageous to inviting bids unit of reasonable suggestion, can't make use of to bid the technique and strategy for quoting, as a result, can not win a mark. Therefore, invite bids to bid activity in have to study is biding to quote medium instruction thought, offer strategy, mark technique.
Is so-called to bid to quote strategy, mean to bid the unit makes sure under the legal competition condition, according to the real strenght and condition of oneself of bid target, compete counterplan and offer technique. Namely decide to bid to quote behavioral decision thinking and activity, include to bid to quote target, counterplan and technique three main factors. Saying towards biding unit coming is controling the information dynamic state of rival and relevant data behind, generally is at to bid to quote s
trategy because of with each other vegetable comprehensive analytical foundation up, whether decision takes part in to bid to quote; Make sure after deciding to take part in to bid to quote what kind of bid target; Adopt in the competition what counterplan with win a rival, attain a medium object purpose. This kind of research is analytical, the concrete process that draws up to bid to quote strategy.
Bid to quote a target is bid the unit is by particularly biding to conduct; Make use of the management condition and advantage of oneself, pass the means of competition tries hard for the benefits target for attaining. This benefits target is to bid unit management instruction thought of concrete embodiment, is also bid core main factor and choice of quoting the strategy to compete a counterplan and quote the basis of technique. The research bids to quote strategy to bid to quote a target beginning from the analysis,
research concerning the competition counterplan, the fitting use quotes technique and forms biding of a set of integrity to quote strategy and actually wins an object purpose now.
A, bid the choice target for quoting
Because biding the management ability of unit is different from the condition, proceed from a different
purpose demand, to the same invitation to bid item, can have the dissimilarity the choice for biding to quote a target.
(A)existence type. Bid to quote is with overcome business enterprise existence crisis for target, fighting for the medium mark can take no account of various benefits principles.
(Two)compensate a type. Bid to quote with compensate business enterprise task shortage, with pursue limit efficiency for target. To the engineering equipments bid is a little bit greatly passionate, low offer take lossing in business as price, have a very strong competition ability. But be subjected to restriction of the production ability, should only consider in smaller invitation to bid item.
(Three)development type. Bid to quote to expand a market, backlog experience, backward and continuously bid the item development as target. Bid to take a development, provide for gold, technique devotion means, carry on technique experience storage, set up new market image, in order to contend for follow-up the efficiency for biding. Its characteristics is to don't fix attention on to bid at a time efficiency, bid with the low offer attraction unit.
(Four)competition type. It is to take competition as means to bid to quote, take low earnings as a target, offer is at accurate calculation offer cost foundation up, well quote the offer target of each rival a
ttains by having the offer of competition ability medium object purpose. Throw mark offer to express aggressive participation consciousness to the engineering equipments.
(Five)earnings type. Bid to throw price to well develop oneself advantage, take realization's best earnings as a target, bid unit to efficiency without item enthusiasm of attraction not high, be full of self-confidence to the earnings big item, also not too pay attention to the motive analysis to the rival and counterplan to grind to investigate.
The dissimilarity bids to quote the choice of the target according to the certain condition carry on analytical decided. Compete sex to bid to quote a target is bid the universal form that the unit pursues.
Two, decide to choose the factor of quoting the target of biding
Make sure what kind of biding and quoting the target not is to fo llow one's
石家庄铁道大学四方学院毕业论文
inclinations, arbitrarily choose. Want to study to invite bids item first in the technique, economy, various various request, secondly is the technique, economy that analyzes an oneself and manage various various advantage and shortage, however after together bid oneself condition to i
tem request to be one by one carry on checking against, make sure that the oneself is biding to quote medium competition position, draw up to beneficially bid to quote a target. This analysis and check against to mainly consider a following factor.
(A)technique material the ability and worker's technique operate level. Bid the technique condition of item, give to bid the unit make the request of corresponding the technique material ability and worker technique operation level. If can not adapt to, need to be renewed or lately place a technique equipments, carry on a technique training to the worker, or outsource and at outside the organization buy, therefore bid the unit have disability or from here arouse of the variety of offer cost, all directly influence to bid the choice of target. Whereas, have a biding of high technique material and operation ability, the unit accepts a load of technique level lower engineering item, the efficiency chooses to equally have already compared the general situation limit.
(Two)design ability. The engineering designs usually is bid the item constitute part, in the synthetic invitation to bid item, design work request and more important position of the workload occupancy, biding the design ability of unit can adapt to the request of inviting bids the item, directly decide to throw an object method and bid the choice of target, design ability that adapts to invite bids engineering, can well develop the advantage of bid ing the unit, Be signed to a competition of active po
sition.
(Three)acquaint with procedure to the invitation to bid item. Is so-called to acquaint with degree is bid the unit is past to this engineering item whether accepted to once set up, the backlog had what experience, predict that the ability of risk contains much big etc.. The item acquaints with and then can strengthen confidence and ease risk loss, may well can extend the competition ability for biding. The item doesn't acquaint with, will well consider can not to see of risk factor, provide guarantee measure and design to meet an emergency ability. This means increasing of indirect devotion and has a certain difficulty in biding target choice.
(Four)bid the item can bring of later on opportunity, so-called later on opportunity, be bid unit in the middle of fighting for mark after, probably to continuous from now on bid to take of medium mark opportunity, or in aftertime to similar item in the middle of adopting
while biding mark occupy beneficial position. If with empress opportunity more, to bid unit's setting up image is as beneficial as extension market and so invite bids to this the item does some concessions to attain on the economic benefits medium the mark purpose is also beneficial. If the opportunities are few, so weigh consideration to the economic efficiency important step for biding later on.setting是什么意思中文翻译
(Five)bid the exit opportunity that the item may bring. Extend an international market, fight for bid in the nations in have position is bid the unit pursue of important target, to can bid for nations to win victory to bring greater opportunity of bid item, undoubtedly biding the unit should test the problem of Lyu first. It decides to this bid item realistic efficiency of low level choice.
(Six)bid the production quality that the item may bring to raise. Bid the item on the other hand need mutually accommodative production material and labor technical ability, may also give to bid the unit bring a technical progress on the other hand, the exaltation of strengthening of management level and work quality, this kind of amount of quality high degree, undoubtedly bid the unit is interested in, directly influence it bids the decision of earnings target.
(Seven)bid the cost that the item may bring lower an opportunity and bid unit after fighting for in the mark, in the process of fulfilling contract in, generally speaking, each management raises of the comprehensive achievement will directly reflect opportunity and degree that lower in the cost up, biding the completion of item can for with after contract for management to bring cost to lower more and bigger opportunity, will also influence to bid unit to bid the decision of earnings target.
(Eight)bid the competition degree of item. The so-called competition degree means that amount and each competition bidder of unit that participate in to bid
Of motive and target. It wears to bid unit efficiency from the external check and supervision target choice of proper restraint. The competition of biding comes to a decision to bid the unit has to take internal condition as foundation while biding and take competition in the market as to lead to and draw up exactitude of bid target.
Bid unit to the dissimilarity to say in addition, such as contract for engineering to deliver goods condition, method of payment, history experience, risk etc. is all factor that influences to bid a target choice, have important function to the decision that chooses to bid a target thus.
Three, decide to bid the quantity of target factor turns analysis
石家庄铁道大学四方学院毕业论文
Decide to bid the factor of target generally be not stand alone an occurrence function of, bid unit to the dissimilarity to say, each is different to bid the decision factor of item influence degree and function direction are also different. Have to take into overall balance, comprehensive consideration. Here, a very important technique problem is to chase a not comparable various phenomenon factor and has been analyzed the conversion turn a factor for the quantity that can compare and use a calculation opportunity to bid to always divide the method of value, the concrete assurance bids the choice of targ
et. Its procedure is:
(A)according to biding unit circumstance, the concrete assurance participation quantity turns an analytical basic factor. The quantity turns the choice of analyzing the factor, according to biding the different circumstance decision of item, can reflect production, management, technique and quality each on the side, and hold tight vital link.
(Two)turn an analysis factor to the quantity for making selection, measure it to produce the opposite and important degree in the management in the business enterprise, make sure to add a power number respectively, the power counts total amount to 100.
(Three)use to beat to divide a method to measure to bid the contented degree that the item turns to analyze a factor to the quantity, make sure that its opposite cent is worth.Turn each quantity the factor demarcation is Gao(10 divide) and medium(5 divide) and low(0 divide) three fileseses to beat a cent, easy to comparison. For example, bid existing technique material of unit the ability and worker operate level to judge the opposite cent value of the factor to divide for" Gao ", settling to 10 towards completing to bid item to have a little bit greatly maying , then canning.
(Four)make the power number of each factor judging the opposite cent value of the grade of satisfying
the degree with multiply each other, beg getting a goal of an each factor; Get a goal each factor to mutually add, get the total cent of this engineering equipments item opportunity to bid to be worth. For example: Some engineering equipments item opportunity to bid evaluation.
(Five)divide the engineering equipments item opportunity to bid to always be worth 825 cent together bid unit in advance certain of can accept best quotation the value carry on a comparison for cent, assurance whether participation bid to quote and how quote.(namely basis what kind of the target quote)Generally speaking:
①opportunity to bid always when cent's being worth is lower than to schedule to best quotation to be worth for cent can choose to give up the opportunity to quote of biding; Opportunity to bid always divide is higher than to schedule to a best quotation score, can

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系QQ:729038198,我们将在24小时内删除。