Fans & Motor Installation Check List for AHU11
Project Phase | DQ IQ OQ PQ ____________ |
Project Name | Extension of Film Facility HuaiRou |
Project No. | BJMCFP201003 |
Plant / Building | Huai Rou / PCM2 |
Unit / Equipment | HVAC /AHU11 |
Document Code | BJMC_02_01_AHU11_IQT_MOF |
Revision | 1.0 |
Approval of Test Scope | ||||
Name | Signature Reason | Department / Function | Date | Signature |
Mark Hu | Author | Project Manager | ||
Fans & Motor Installation Check List for AHU11
Check Description | Acceptance Criteria | Result | Checked by /Date |
General installation check 一般性安装检查 | - Labeling - No damage - All fixation elements are tightly installed - Carefully check the inner of fan, there is must no foreign matter which produced by instruction - Vibration isolators properly installed to ensure the uniform vibration absorb - Pulleys tightly installed to the fan shafts - Drive belt tension by squeezing the belt with the thumb and the index finger at the location as shown below: - Deflection <0.5cm each side, tight connection - The impeller run steady, the position of the impeller won’t stop in the same position after running - Correct rotation direction - Freshly Lubricated - 标签齐全,正确 - 没有损坏 - 所有的装配件都紧固地安装在一起 - 仔细检查风机内部,内部无施工遗留异物 - 减震器安装正确,能确保吸收减震 - 皮带轮紧固地安装在风机轴上 - 驱动皮带用指压法检查皮带的涨紧度,用食指和拇指在图示位置指压,每边的偏移<0.5cm. - 叶轮运转稳定,手动盘车后,叶轮不总是停留在同一个位置 - 正确的运转方向 - 足够的润滑 | ||
Interface connection check 界面接口检查 | - Power wire has been connected by good engineering practice , compliance with Chinese nation construction acceptation code . - Protection earth wire has been connected by good engineering practice, compliance with Chinese nation construction acceptation code. - 动力电缆已经很好地连接,符合中国的国家施工验收规范。 pulleys- 接地电已经很好地连接,符合中国的国家施工验收规范。 | ||
Comments:
Viewed by/Date: