Fans & Motor Installation Check List for AHU11
Project Phase
DQ        IQ            OQ          PQ        ____________
Project Name
Extension of  Film Facility HuaiRou
Project No.
BJMCFP201003
Plant / Building
Huai Rou / PCM2
Unit / Equipment
HVAC /AHU11
Document Code
BJMC_02_01_AHU11_IQT_MOF
Revision
1.0
Approval of Test Scope
Name
Signature Reason
Department / Function
Date
Signature
Mark Hu
Author
Project Manager

Fans & Motor  Installation Check  List for AHU11
Check Description
Acceptance Criteria
Result
Checked by
/Date
General installation check
一般性安装检查
- Labeling
- No damage
- All fixation elements are tightly installed
- Carefully check the inner of fan, there is must no foreign matter which produced by instruction
- Vibration isolators properly installed to ensure the uniform vibration absorb
- Pulleys tightly installed to the fan shafts
- Drive belt tension by squeezing the belt with the thumb and the index finger at the location as shown below:
-

Deflection <0.5cm each side, tight connection
- The impeller run steady, the position of the impeller won’t stop in the same position after running
- Correct rotation direction
- Freshly Lubricated
- 标签齐全,正确
- 没有损坏
- 所有的装配件都紧固地安装在一起
- 仔细检查风机内部,内部无施工遗留异物
- 减震器安装正确,能确保吸收减震
- 皮带轮紧固地安装在风机轴上
- 驱动皮带用指压法检查皮带的涨紧度,用食指和拇指在图示位置指压,每边的偏移<0.5cm.
- 叶轮运转稳定,手动盘车后,叶轮不总是停留在同一个位置
- 正确的运转方向
- 足够的润滑
Interface connection check
界面接口检查
- Power wire has been connected by good engineering practice
, compliance with Chinese nation construction acceptation code .
- Protection earth wire has been connected by good engineering practice, compliance with Chinese nation construction acceptation code.
- 动力电缆已经很好地连接,符合中国的国家施工验收规范。
pulleys- 接地电已经很好地连接,符合中国的国家施工验收规范。
Comments:
Viewed by/Date: