缩写说明
Metrics:
HR Dept.:
L.W.D.C: Lost Work Day Case Rate
Quality Dept.:
COQ: Cost of Quality (质量成本)
WIR: Wiring Incident Report (配线报告)
FTQ: First Time Quality (
WFCC: Worldwide Formal Customer Complaint (所有客户正式的反馈)
PPM:Pieces per Million (一百万产品)
RRPPM: Return & Reject Piece Per Million (不合格部品多少钱)IPTV: Incident Per Thousand Vehicles (运输中发生的事故部品)
Engineering Dept.:
C/O: Changeover time (对策转变时间)
C/T: Cycle Time (周期时间)
PDT: Planned Downtime (计划停产期)
LT: Lost Time (损失时间)
DT: Downtime (停产期)
OA: Operational Availability (操作可行性)
OE: Operational Effectiveness(效力的可行性)
PC&L Dept.:
OEM: On time Shipments (及时出货)
customer的中文意思IPM: Incident Per Million (事故损失的钱数)
E&O: Excess & Obsolete (超额完成&荒废的)
PRR: Problem Resolving Request (问题分析请求)
MU: Material Utilization (材料的利用)
Others:
Tpct: Total Production Cycle Time (整体生产周期)
MCR: Material Cost Reduction (材料成本的精简)
6SIGMA
DMAIC: Define, Measure, Analysis, Improve, Control
VOC: Voice of Customer
CTQ: Critical to Quality
SIPOC: Supplier, Input, Process, Output, Customer
I&CIM: Innovation, & Continuos Improvement
TMAP: Though Map
PMAP: Process Map
MSE: Measure System Evaluation
FMEA: Failure Modes and Effects Analysis
NEM: Numerical Evaluation of Metrics
ANOVA: Analysis of Variance
DOE : Design of Experiments
LEAN
1.DMS -- Delphi Manufacturing system
⏹EEI : Employee Environment & Involvement
⏹WPO: Workplace Organization
⏹QS: Quality System
⏹OA: Operational Availability
⏹MM: material movement
⏹MSD: Manufacturing System Design
2.KMS -- Kaizen Manufacturing system
3.OSKKK -- Observation, Standardization, Kaizen, Kaizen, Kaizen ……
4.PFP -- People Focus practice
5.VSM—Value Stream Mapping
6.TPM: Total Production Maintenance
7.PMP: Production Maintenance Partnership
8.PM: Planned Maintenance
9.TPS: Toyota Production System
10. SMED: Single Minutes of Exchange Die
12. FIFO: First In First Out
13. 5S: Clear (Sort), Organize ( Straighten), Clean(Sweep), Maintain (Standardize),
Continuous Improvement ( Sustain)
14. NWG: Natural Work Group
15. WIP: Work In Process
16. PFEP: Plant For Every Part
17. JIT: Just in Time
18. PDCA: Plan – Do – Check – Action
19. SQIP: Supplier Quality Improvement Process
20. VOC: Voice of Customer
21. MSDS: Material Safety Date Sheets
22. PDP: Product Development Process
23. PTC: Protect The Customer
24. APQP: Advanced Product Quality Planning
25. SPDP: Supplier Performance Development Process
26. QSA: Quality System Assessment
27. SPC: Statistic Process Control
28. PDAP: Production Part Approval
29. DBS: Delphi Business System
30. MSA: Measurement System Analysis
31. FMEA: Failure Mode and Effects Analysis
32. TLCC: Total Life Cycle Cost
Each Function
HR Dept:
HR: Human Resource
PBP: People Business Plan
NWG: Natural Work Group
PPI: People Performance Index
MSDS: Material Safety Data Sheets
OSHA : Occupational Safety and Health Administration
IS&S Dept.
IS&S: Information System and Service
IT: Information Technology
FS: Fourth Shift
MRP: Material Requirement Plan
ERP: Enterprise Resource Plan
SAP: System, Application & Products
JIT: Just – In – Time
SILS: Supply in Line Sequence
OA: Office Automation
ISP: Information Security Policy
FIS: An information System Supporting Audi A4 Production in FAW-VW
BF: Back Flush
OS: Operation System
IP: Internet Protocol
PC& L:
PC& L: Production Control & Logistic
E & O: Excess and Obsolete
PFEP: Plan For Every Parts
TOR: Turn Over Rate
IPM: Incident Per Million
MPS: Master Production Schedule
PO: Purchasing Order
MOQ: Minim Order Quality
PPQ: Part Packing Quality
L/T: Lead-Time
BOM: Bill of Materials
WIP: Work In Process
FIFO: First In First Out
DOH: Day On Hand
PR/R: Problem Resolution and Reporting
I/E Dept
I/E: Import & Export
LMC: Logistic Management Company
P/A: Public Affairs
RDC: Regional Distribution Center
C.C : Consolidation Center
CCIB: China Commodity Inspection Branch
CD: Customs Duty
VAT: Value Added Tax
PR/R: Problem Resolution and Reporting
Quality Dept.
QC: Quality Control
QSA: Quality System Assessment
DBS: Delphi Business System
PDP: Product Development Process
APQP: Advanced Product Quality P lanning and Control Plan
PPAP: Production Part Approval
SPDP: Supplier Performance Development Process
MSA: Measurement System Analysis
SPC: Statistic Process Control
FMEA: Failure Mode And Effects Analysis
CSE: Customer Support Engineer
IP: Improvement Plan
DOE : Design of Experiments
Gage R&R : Gage Repeatability and Reproducibility SQIP: Supplier Quality Improvement Process GD&T : Geometric Dimensioning and T olerancing PR/R : Problem Resolution and Reporting
AE Dept.
PDP: Product Development Process
--PI: Product Initiation
--CD: Concept Direction
--CA: Concept Approval
--PA: Product Approval
AE: Application Engineering
OTS: Off- Tool- Samples
SOP: Start of Production
OS: Start null series
CKD: Comletely Knocked Down
MPI: Muli Point Injection
PDM: Product Description Manual
ABS: Anti-Blacker- System
EOP: End of Production
CES: CATIA Electric System
GPS: Global Positioning System
AT: Automatic Transmission
AC: Air Condition
TDI: Turbo direction injection
SDI: Suck Diesel Injection
CAN: Controller Area Network
SKD: Semi Knocked Down
CVT: Continuously Variable Transmission
DUM: Digital Mock Up
ADP: Delphi Advanced Development Process
Engineering Dept.
M & TD: Machine & T ool Design
PCT: Planned Cycle Time
SWIP: Standard Work In Process
CAD: Computer Aided Design
版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系QQ:729038198,我们将在24小时内删除。
发表评论