Project maturity
check
Phases Process responsibility
Key milestones
Product maturity
check
FMEA
Financial risk
checks
Lessons learned Time line [month] 10)
Product status
Project Life Cycle
ALH/PM edition 14 17.04.2018
Test level LED PCBA
Activities
Industrialisation / Process tuning
Concept Launch Ramp Up
Development
Project Buy-in
Release for Development
Release for Industrialisation
Release for Launch
Release for
SOP
Project Buy -off
Offer Plant (QM)
Industrialisation / Process build
Project management
Sales
Kick off mtg.
1st off tool parts Product concept feasibility study SOP
Product
validation end
Concept rel.
B1 = Lighting samples B2 = Soft tool samples (styling, dimensional)
Tool production
Valid. & tuning
Tool concept
Product and process concept design Product and process detailed
development
Product validation Process validation
Tools & equipment production
Serial production
Validation & tuning
Assembly line production
Proto A
Proto B
Proto C0
Proto D1
Serial product
Customer releases
Operators training
G r a i n i n g 3r d l o o p
2n d l o o p
1s t l o o p
FRC G6
FRC G5
Feasibility report
QRC 0 QRC 1
QRC 2 QRC 3
AL
SOP
Process appr.
Assy. line installed
Tool Transfer
Component
appr.
Status 2
11)
Develop. rel.
ID Coversh. appr.
Status 1
FMEA 1) interface Concept rel.
D2C
12)
Pre Initiative meet.
Go to steel
Initiative meet.
FRC G7
Customer Award
Tool supplier RFQ
samples for product appr.
components of series
tools,
made in sample shop
ID Coversh. issue
Suppliers Award.
Kick-off EE.
PCBA supplier RFQ
validation verificationPCBA
Supplier nom. A samples
B samples
C0 samples
Serial product
C1 samples
Proto C1
components of optimisation loops, produced on not released assy.line
FMEA 4) product
FMEA 4) process MM Initiative appr.
Legend:
AL milestones AL- Design milestones Customer milestones
15)
Low run
rel. - release mtg. - meeting appr. - approval avbl. - available
Product appr.
1 Mouldflow
8)
2 Mouldflow
9)
8) Moldflow analysis done by designer after Status 1 (if applicable)
9) Moldflow analysis done by final tool supplier
10) Timing indicated in diagram, is average lead-time reference 11) Verification of product design & process design 12) Optional valid for strategy project
13)
EEM/EPM checklist must be updated at the end of each WCM step
14) Validation of Process and Product in definive / final configuration
Financial milestones Tools milestones
FMEA 3) product
FMEA 3) process Styling samples (rapid prototyping)
Assembly line concept FMEA 5) product
FMEA 5) process
LED modules C-samp.
Supplier. spec.
Suppliers RFQ
R@R 3
R@R 2
R@R 1
15)
RQA
SE partner def.
12)
FMEA 2) product
FMEA 2) process 1) FMEA Product Interface - interface with Customer ( optional) 2) FMEA start
3) FMEA creation + report 4) FMEA file update 5) FMEA update + report
6) Revision of LL predecessor done by Offer team
7) Revision of LL predecessor done by project team
G0
G2
(PA0)
G3
(PA1)
G4
G5
(PA2)
G6
(PA3)
G7
(PDR)
S t a r t U P
G1
(PR)
Charter rel. Baseline appr.
RFQ
kick off
Concept verification Development verification (DV1)
Product validation
(DV2) Process validation
(PV)14)
Proto D0
of released components, produced on tech. released
Mass
production Handover mtg. C0 delivery
D0 delivery
Project Execution
start
Release for C0 delivery
LL Project revision FR
FRC G4
FRC G2
LL 6) predecessor
offer
LL 7)
predecessor
LL Project revision LL Project revision
Phase 1 Step 1 Step 2
S1
Step 3
Phase 2 Step 2 Phase 3 Step 4
Step 5 Step 6
Step 7
Step 4
Step 3 Step 5
Step 6
Step 7
Phase 4
D2C 12)
WCM EEM Ref. WPI
WCE DS Ref.
13) FRC G1
FRC INI
-3 -2 -1 1 2 3 4 5 6 7
8 9 10 11 12 13 14 15 16 21 22 23 24 25 26
27 28 29 30
17 18 19 20 D samples A-
Samples EE avbl.
Status 1 EE B- Samples EE avbl. Pre-
select. Supp.
EE.
Status 2 EE
Award Supp. EE
C0- Samples
EE avbl.
C1- Samples EE avbl.
Val. EE finished
PPAP
Supp.EE release
D-
Samples EE avbl.
SOP Supp. EE V e r i f i c a t i o n
D e s i g n
P r o d u c t i o n
V e r i f i c a t i o n
D e s i g n
P r o d u c t i o n
V a l i d a t i o n
R e l e a s e
P r o d u c t i o n
P r o d u c t i o n
D e s i g n
D e s i g n
P r o d u c t i o n
V e r i f i c a t i o n